Federal Communications Commission Atten: Carmen Weathers 445 12th Street, SW Washington, DC 20554 Subject: Network Notification No. 97 Short Term Public Notice Under Rule 51.333a (Less than 6 months notice) This Notice, pursuant to CFR 47, Subsections 51.325 – 51.335 advises of the following Network change(s) and/or improvement(s) within Telephone Operating Company of Vermont LLC d/b/a FairPoint Communications (“TOCOVT”) and the scheduled implementation date. Vermont Wire Centers: Vergennes, Vermont Vergennes Remote Terminal VRGSVTMO VRGSVTBN Vergennes, Vermont Ferrisburgh Remote Terminal VRGSVTMO FRGHVTAC Planned Implementation or Retirement Date: August 30, 2016 Description of Foreseeable Impact These network changes will create the potential for spectral interference on the CO-based ADSL and/or a Digital Design Loop (DDL) loops that share the same binder groups as the RT ADSL within the copper distribution feeder cable past the Feeder Distribution Interface (FDI). Description of Change: When FP is installing a Digital Line Subscriber Access Multiplexer (DSLAM) or Litespan to provide Digital Subscriber Line (DSL) service from a Remote Terminal (RT) that is less than 30,000 feet from the Central Office and only when copper feeder is present between the Central Office and RT. Attachment: Certificate of Service Contact: Mary Groom Barbara Galardo (Regulatory) 802-951-1559 207-535-4126 mgroom@fairpoint.com bgalardo@fairpoint.com 1 Davis Farm Road Portland, Maine 04103 May 25, 2016